Mutual Fund Calculators
How to Calculate a Systematic Transfer Plan
Learn how to model a systematic transfer plan with separate rates, a worked partial transfer example, and the difference between STP, SIP and SWP.
- Published:
- Updated:
- Reviewed:
Editorial dates are calendar dates in India Standard Time.
Keywords
- systematic transfer plan calculator
- mutual fund transfer projection
- monthly transfer between funds
- STP partial transfer
- source and destination balance
Follow both sides of the transfer
An STP projection tracks the invested balance that supplies each transfer and the separate balance that receives it. A transfer changes the allocation immediately. Combined value changes as the balances earn their respective modeled returns.
What an STP projection measures
A systematic transfer plan (STP) moves amounts from a source investment to a destination investment. This model starts with one source balance and an empty destination.
The model keeps the transfer inside the combined portfolio. Actual switching can involve redemptions and subscriptions and may follow separate product rules.
Compare transfer schedules
Run the same opening amount and rates at different monthly requests to see how quickly funds move and whether the source can fund the whole schedule. Try equal rates to isolate the allocation effect.
STP formula and order
Convert each effective annual decimal rate A to its monthly factor (1 + A)^(1/12). Beginning timing moves the funded amount before both balances grow. End timing grows both balances first. Each funded amount is the lesser of the request and available source.
Funded transfer = min(monthly request, available source)
- Beginning timing: subtract the funded amount from source and add it to destination, then grow each.
- End timing: grow both balances, then debit and credit the same funded amount.
- The combined ending value is the sum of both ending balances.
Reconcile a partial transfer
With a source balance of 1,000, a monthly request of 400, zero returns and three months, transfers are 400, 400 and 200. The source ends at zero, the destination at 1,000 and the combined value at 1,000. Unmet requests total 200 and signed growth is zero.
If the request is 500 instead, month 2 moves the final 500 in full. In a three-month horizon, the first shortfall then occurs in month 3 and funds zero.
- Enter 1000 as opening source and 400 as monthly transfer.
- Enter zero for both annual rates and three months.
- Check the combined value, funded total and the 200 transferred at the first shortfall.
Separate allocation from growth
The combined ending value equals opening source plus signed modeled growth. Requested less funded equals unmet. A full transfer can deplete the source before any request goes unfunded.
At equal rates each unit of capital experiences the same growth factor wherever it is held. With unequal rates, the timing changes how long transferred amounts experience each rate.
Enter two rates and choose timing
Enter the opening source, fixed monthly request, both effective annual percentages and complete months. Choose beginning or end timing. Read the balances, monthly rates and transfer outcomes together.
Enter both rates explicitly, using zero for a flat assumption. Use the same currency for the opening amount and requests.
Choose between STP, SIP and SWP
Use STP for two connected investment balances. Use the SIP calculator for fixed contributions from outside the portfolio and the SWP calculator for withdrawals that leave the portfolio.
Understand the checkpoint convention
Both balances use equal model months and the destination starts at zero. The same funded amount leaves the source and enters the destination immediately. The first request is labeled month 1 for either timing.
A beginning transfer first affects growth in that month. An end transfer first affects growth in the following month.
Respect the projection limits
Opening amount and monthly request range from 0 to 10^12, horizon from 0 to 1,200 months and each annual percentage from above −100% to 100%. Decimals allow 12 fractional places. Arithmetic uses at least 100 significant digits, flags unresolved funding thresholds and rejects combined ending values above 10^30.
The source can fund a partial amount. Actual provider minimums and instructions may handle insufficient balances differently.
Avoid counting the transfer twice
Do not add funded transfers to the combined value again. Check whether another calculator applies returns before or after the switch, and whether the annual rates use the same basis.
Use effective annual rates. For example, 12% effective annual growth implies about 0.948879% monthly.
Use one currency across both investments
In India, STP and scheme switching are common terms. In the USA, UK, Canada and Australia, phased transfers between investments describe this modeled scenario. Choose USD, GBP, CAD, AUD or INR for display. Local account rules and product eligibility are outside the model.
Educational scope
Educational constant-return projection in one currency. It excludes dates, eligibility, settlement, NAV, taxes, fees, inflation, FX and changing market returns. It does not provide personalized investment advice.
Companion calculator
Put the method into practice.
Frequently asked questions
How does an STP differ from a SIP?
How does an STP differ from an SWP?
Can a full transfer deplete the source without a shortfall?
Why can the timing change combined value?
Does the model calculate actual fund units?
Does choosing INR, GBP or another currency convert my results?
Sources and review
Sources reviewed . Consult current local rules before relying on time-sensitive information.